Philipps-Universität Marburg: Connecting past and present, safety and comfort

Completed by the end of 2017, the new university library in central Marburg stands between St Elisabeth’s Church and the Old Botanical Garden. The distinctive building forms the heart of the future Campus Firmanei, connecting the surrounding historic buildings with the modern university.

Visit a reference project

Solution

Smoke Ventilation

Location

Marburg, Germany

Sector

Education

Project Type

New build

Controls & Technology

FlexiSmoke

Products

WMX 826, WSC 520

Year

2017

Project partners

Chubb Deutschland GmbH

Safety built into the façade

WindowMaster supplied the control system and components for heat and smoke ventilation, including chain actuators fitted to vertical, side-hung windows integrated into the façade. The solution uses FlexiSmoke™, with WMX 826 actuators and WSC 520 panels.

Philipps University Marburg, Library

Louvre expertise, built in

The library project also features louvre windows from FIEGER. As a specialist in large blade louvre window systems, FIEGER focuses on combining ventilation performance, façade integration and technical reliability.

Philipps University Marburg, Library

Tested and fine-tuned

Before students and staff moved in, the university tested the complete smoke extraction system. Artificial smoke was introduced into the east and west wings, then discharged through the façade openings. Test runs averaged two to three hours, allowing the installer and university to fine-tune the system. Design consultants, fire safety specialists and fire service representatives attended. Following these adjustments, further testing achieved the required result to the university’s full satisfaction.

Philipps University Marburg, Library

Contact

Get in touch